{"id":35782,"date":"2026-08-09T04:12:01","date_gmt":"2026-08-09T04:12:01","guid":{"rendered":"https:\/\/gsrra.com\/?p=35782"},"modified":"2026-08-09T04:12:01","modified_gmt":"2026-08-09T04:12:01","slug":"jura-energy-commences-production-from-a-gas-well-in-pakistan","status":"publish","type":"post","link":"https:\/\/gsrra.com\/?p=35782","title":{"rendered":"Jura Energy commences production from a gas well in Pakistan"},"content":{"rendered":"\n<ul class=\"wp-block-list\">\n<li>The Maru Lease covers an area of approximately 15.41 square kilometres and is situated across Punjab and Sindh<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.google.com\/preferences\/source?q=brecorder.com\" target=\"_blank\" rel=\"noreferrer noopener\"><\/a><strong>Jura Energy Corporation (Jura), a Canadian energy company, announced on Friday that its development well Maru-3, located in the Maru Lease, located in Punjab, Pakistan, has been completed and brought into production.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cJura announces that the development well Maru-3, in the Maru Lease, has been completed in the Pirkoh Limestone formation of Eocene age,\u201d read a statement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Maru Lease covers an area of approximately 15.41 square kilometres and is situated across Rahim Yar Khan in Punjab and Ghotki in Sindh.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During a post-completion test on a 64\/64 inch choke, the well flowed conventional natural gas at an average rate of approximately 1.02MMcf\/d with an average wellhead flowing pressure of approximately 105 psi, said the company.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe development well Maru-3 was drilled to a total measured depth of 951 meters. After tie-in with the production facilities, the well has been put on production and is currently producing approximately 0.7 MMcf\/d of gas,\u201d Jaru said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.brecorder.com\/news\/40424271\/new-oil-amp-gas-discoveries-boost-pakistans-energy-reserves-in-2025\" target=\"_blank\" rel=\"noopener\"><strong>New oil &amp; gas discoveries boost Pakistan\u2019s energy reserves in 2025<\/strong><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The company expects production to increase after the production build-up survey and acid simulation, which is currently planned to be carried out in Q4 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Jura holds a 10.66% working interest in the Maru Lease, which is operated by Oil and Gas Development Company Limited.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Jura Energy Corporation is a publicly listed energy company incorporated in Alberta, Canada, that is engaged in the exploration, development, and production of petroleum and natural gas properties in Pakistan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It operates in Pakistan through its wholly-owned subsidiaries, Spud Energy Pty Limited (SEPL) and Frontier Holdings Limited (FHL). Both SEPL and FHL hold working interests in various exploration licenses and leases in the country.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Reference Link:- <a href=\"https:\/\/www.brecorder.com\/news\/40433860\" target=\"_blank\" rel=\"noopener\">https:\/\/www.brecorder.com\/news\/40433860<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Jura Energy Corporation (Jura), a Canadian energy company, announced on Friday that its development well Maru-3, located in the Maru Lease, located in Punjab, Pakistan, has been completed and brought into production. \u201cJura announces that the development well Maru-3, in the Maru Lease, has been completed in the Pirkoh Limestone formation of Eocene age,\u201d read [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6741,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"aside","meta":{"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[2],"tags":[33191,2076,6690,33189,33190,33192,483],"class_list":["post-35782","post","type-post","status-publish","format-aside","has-post-thumbnail","hentry","category-sample-category","tag-canadain-energy-company","tag-economy-2","tag-energy-3","tag-gas-production","tag-jura-energy","tag-maru-3","tag-pakistan-2","post_format-post-format-aside"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/posts\/35782","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gsrra.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=35782"}],"version-history":[{"count":1,"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/posts\/35782\/revisions"}],"predecessor-version":[{"id":35783,"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/posts\/35782\/revisions\/35783"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/media\/6741"}],"wp:attachment":[{"href":"https:\/\/gsrra.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=35782"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gsrra.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=35782"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gsrra.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=35782"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}