{"id":21352,"date":"2025-07-07T05:31:51","date_gmt":"2025-07-07T05:31:51","guid":{"rendered":"https:\/\/gsrra.com\/?p=21352"},"modified":"2025-07-07T05:31:52","modified_gmt":"2025-07-07T05:31:52","slug":"serbia-completes-key-chinese-built-highway-section-with-longest-tunnels","status":"publish","type":"post","link":"https:\/\/gsrra.com\/?p=21352","title":{"rendered":"Serbia completes key Chinese-built highway section with longest tunnels"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/english.news.cn\/20250707\/fc33c0572fdd4ce58488b13e5ffecaec\/20250707fc33c0572fdd4ce58488b13e5ffecaec_CbsbeeE007003_20250707_CBMFN0A001.JPG\" alt=\"\"\/><figcaption class=\"wp-element-caption\">Serbian President Aleksandar Vucic attends the opening ceremony of a Chinese-built highway section in southwestern Serbia&#8217;s Lucani municipality, July 5, 2025. S (Photo by Wang Wei\/Xinhua)<\/figcaption><\/figure>\n\n\n\n<p><strong>He noted that the newly completed section not only connects northern and western Serbia, but also strengthens people-to-people ties, improves traffic flow, boosts economic development, and enhances quality of life.<\/strong><\/p>\n\n\n\n<p>Serbian President Aleksandar Vucic on Saturday inaugurated the final segment of the E-763 &#8220;Milos Veliki&#8221; highway between Pakovrace and Pozega, completing the entire 30.9-km Preljina-Pozega section.<\/p>\n\n\n\n<p>The opening ceremony took place at the entrance of the Munjino Brdo tunnel in southwestern Serbia&#8217;s Lucani municipality. It was attended by Chinese Ambassador to Serbia Li Ming, senior Serbian government officials, representatives of Chinese and Serbian infrastructure companies, and hundreds of local residents.<\/p>\n\n\n\n<p>&#8220;This is one of the most important infrastructure projects in our country. Together with our Chinese friends, using their technology and our determination, we overcame all challenges,&#8221; said Vucic at the event, highlighting the contribution of China Communications Construction Company (CCCC).<\/p>\n\n\n\n<p>The newly opened 19.56-kilometer stretch includes Serbia&#8217;s two longest road tunnels &#8212; Laz (2,858 meters) and Munjino Brdo (2,861 meters) &#8212; constructed to international standards using advanced engineering technologies. Vucic said the project reflects Serbia&#8217;s transformation into a strong and modern state with safe, high-quality highways.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/english.news.cn\/20250707\/fc33c0572fdd4ce58488b13e5ffecaec\/20250707fc33c0572fdd4ce58488b13e5ffecaec_CbsbeeE007003_20250707_CBMFN0A002.JPG\" alt=\"\"\/><figcaption class=\"wp-element-caption\">Local residents attend the opening ceremony of a Chinese-built highway section in southwestern Serbia&#8217;s Lucani municipality, July 5, 2025. (Photo by Wang Wei\/Xinhua)<\/figcaption><\/figure>\n\n\n\n<p>Traversing challenging mountainous terrain, the section required extensive tunneling and bridge-building work. Vucic emphasized its strategic role in linking central and western Serbia and eventually connecting the country to Montenegro and the Adriatic Sea.<\/p>\n\n\n\n<p>He also announced plans to extend the highway with two new branches from Pozega, aimed at improving transport links across western Serbia.<\/p>\n\n\n\n<p>The E-763 corridor is a key regional transport route that strengthens connectivity between Romania, Serbia, Montenegro, and Italy. With a total investment exceeding 520 million U.S. dollars, the Preljina-Pozega segment ranks among Serbia&#8217;s largest infrastructure undertakings. The first part, between Preljina and Pakovrace, was opened in 2022.<\/p>\n\n\n\n<p>Li described the E-763 highway as a crucial transport artery linking Belgrade with the Montenegrin port of Bar, as well as with western and northern parts of Serbia.<\/p>\n\n\n\n<p>He noted that the newly completed section not only connects northern and western Serbia, but also strengthens people-to-people ties, improves traffic flow, boosts economic development, and enhances quality of life.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/english.news.cn\/20250707\/fc33c0572fdd4ce58488b13e5ffecaec\/20250707fc33c0572fdd4ce58488b13e5ffecaec_CbsbeeE007003_20250707_CBMFN0A003.JPG\" alt=\"\"\/><figcaption class=\"wp-element-caption\">Serbian President Aleksandar Vucic is seen at the opening ceremony of a Chinese-built highway section in southwestern Serbia&#8217;s Lucani municipality, July 5, 2025. &nbsp;(Photo by Wang Wei\/Xinhua)<\/figcaption><\/figure>\n\n\n\n<p>Li said the successful completion of the project reflects the expertise and dedication of all involved, and stands as a testament to the ironclad friendship between China and Serbia.<\/p>\n\n\n\n<p>Passenger traffic on the new highway section will open at noon on Sunday.<\/p>\n\n\n\n<p>Reference Link:- <a href=\"https:\/\/english.news.cn\/20250707\/fc33c0572fdd4ce58488b13e5ffecaec\/c.html\" target=\"_blank\" rel=\"noopener\">https:\/\/english.news.cn\/20250707\/fc33c0572fdd4ce58488b13e5ffecaec\/c.html<\/a><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>He noted that the newly completed section not only connects northern and western Serbia, but also strengthens people-to-people ties, improves traffic flow, boosts economic development, and enhances quality of life. Serbian President Aleksandar Vucic on Saturday inaugurated the final segment of the E-763 &#8220;Milos Veliki&#8221; highway between Pakovrace and Pozega, completing the entire 30.9-km Preljina-Pozega [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":21353,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[2],"tags":[20974,282,29,8656,20971,2836,132,105,20973,20972,1403,20975],"class_list":["post-21352","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sample-category","tag-bilateral-reltaions","tag-bri","tag-china","tag-china-serbia","tag-chinese-built-highway","tag-cooperation","tag-economy","tag-geopolitics-2","tag-infrastructure-development","tag-longest-tunnel-in-serbia","tag-serbia","tag-serbia-completes-key-chinese-built-highway-section-with-longest-tunnels"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/posts\/21352","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gsrra.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21352"}],"version-history":[{"count":1,"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/posts\/21352\/revisions"}],"predecessor-version":[{"id":21354,"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/posts\/21352\/revisions\/21354"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gsrra.com\/index.php?rest_route=\/wp\/v2\/media\/21353"}],"wp:attachment":[{"href":"https:\/\/gsrra.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21352"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gsrra.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=21352"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gsrra.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=21352"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}