Power restoration continues in mudslide-hit Gyirong Port
新闻台署名 来源:新华社、《黎明报》、《阿拉伯新闻》、阿纳多卢通讯社与《分钟镜报》。由 GSRRA 编辑部翻译并节选。


Staff members install a power transformer about 3 kilometers from mudslide-hit Gyirong Port in Gyirong County, southwest China’s Xizang Autonomous Region, Aug. 29, 2026. Staff members of the local power company have set up an emergency power transformer not far from the mudslide-hit Gyirong Port, as part of their efforts to ensure power supply for all rescue operations. Power supply is gradually restored in the mudslide-hit areas. (Xinhua/Jigme Dorje)

A staff member transfers components of a transformer about 3 kilometers from mudslide-hit Gyirong Port in Gyirong County, southwest China’s Xizang Autonomous Region, Aug. 29, 2026. Staff members of the local power company have set up an emergency power transformer not far from the mudslide-hit Gyirong Port, as part of their efforts to ensure power supply for all rescue operations. Power supply is gradually restored in the mudslide-hit areas. (Xinhua/Jigme Dorje)

A staff member checks power cables near mudslide-hit Gyirong Port in Gyirong County, southwest China’s Xizang Autonomous Region, Aug. 29, 2026. Staff members of the local power company have set up an emergency power transformer not far from the mudslide-hit Gyirong Port, as part of their efforts to ensure power supply for all rescue operations. Power supply is gradually restored in the mudslide-hit areas. (Xinhua/Jigme Dorje)

A staff member connects low-voltage output cables near the mudslide-hit Gyirong Port, in Gyirong County, southwest China’s Xizang Autonomous Region, Aug. 29, 2026. Staff members of the local power company have set up an emergency power transformer not far from the mudslide-hit Gyirong Port, as part of their efforts to ensure power supply for all rescue operations. Power supply is gradually restored in the mudslide-hit areas. (Xinhua/Jigme Dorje)

Staff members install a power transformer about 3 kilometers from mudslide-hit Gyirong Port in Gyirong County, southwest China’s Xizang Autonomous Region, Aug. 29, 2026. Staff members of the local power company have set up an emergency power transformer not far from the mudslide-hit Gyirong Port, as part of their efforts to ensure power supply for all rescue operations. Power supply is gradually being restored in the mudslide-hit areas.
Reference Link:- https://english.news.cn/20260830/170aa69866d84ec6871adb4b7bbcd8bf/c.html




